Process De-bottleneck – Case StudyMajor Pipe Manufacturer - NSW, Australia

Process bottleneck

The Challenge

The client was Australia’s largest manufacturer of Oil and Gas pipe. Market pressures and delivery timeframes for some specific customers meant that increased throughput without additional production shifts was required.

The Solution

To understand the process and its performance, 12 months of production data was analysed, with initial analysis showing a significant bottleneck in the production line. More detailed analysis using the Six Sigma DMAIC toolset, in particular, Failure Modes and Effects Analysis (FMEA) and statistical analysis of cycle-by-cycle production data, showed that there were several factors that were contributing to the area being the bottleneck:

1. Component reliability in the production equipment

2. Errors in the equipment control systems that meant that the product was processed multiple times

3. Product specification inconsistencies that forced processing of product through the bottleneck that did not require processing.

The Results

• An increase of between 15% and 30% throughput was achieved, dependent on product mix

• Identification of plant bottleneck areas and their effect on overall performance

• Effective maintenance of equipment in the bottleneck area, as the critical components had been identified

• Appropriate plant throughput measures and targets developed and implemented.

Contact us at the EnterpriseIS office nearest to you or submit an inquiry online.

Looking for an Operational Excellence Specialist?

Share

This website uses cookies and asks your personal data to enhance your browsing experience. We are committed to protecting your privacy and ensuring your data is handled in compliance with the General Data Protection Regulation (GDPR).